News

Klara bridge Halle successfully installed

24 augustus 2020

On Sunday 23 August, the Klara bridge in Halle was successfully navigated to its place with the aid of a pontoon crane. The positioning of this 60 meter long and 85 tonne bridge took only 4 hours.